COBie & FM Ready BIM
Bridging Construction and Operations Through Structured Insight
We support clients in delivering models that go beyond construction—ensuring they’re rich with structured, validated data aligned to COBie standards and facility management needs. From early planning through handover, we embed operational intelligence into BIM workflows, enabling efficient maintenance, lifecycle planning, and asset performance tracking. The result is a digital foundation that bridges design, construction, and long-term operations with clarity and purpose.
COBie Data Structuring & Management
- Capture and organize data in line with COBie standards to ensure consistency and usability.
- Structure model outputs to include spaces, systems, components, and equipment metadata.
- Enable data handover in both IFC and spreadsheet formats suitable for FM systems.
FM-Ready Model Development
- Model with facility operations in mind—ensuring correct object types, naming conventions, and attribute fields.
- Include maintainable assets, spatial zoning, and component-level information relevant for O&M.
- Ensure FM workflows such as preventive maintenance and space management are supported from day one.
Validation & Quality Assurance
- Run automated and manual checks to verify data completeness, accuracy, and compliance with COBie or client-specific requirements.
- Identify missing fields, incorrect classifications, or inconsistencies in asset metadata.
- Provide QA reports to support handover, commissioning, and lifecycle planning.
Integration with CAFM, CMMS & IWMS Systems
- Prepare structured datasets compatible with leading FM platforms (e.g., Archibus, Planon, Maximo, FM:Systems).
- Support data mapping and import processes to ensure smooth integration.
- Reduce duplication of effort and ensure a clean digital handover to operations teams.
Collaboration with Facility Managers & O&M Teams
- Engage FM stakeholders early to understand operational needs and tailor BIM outputs accordingly.
- Translate design and construction data into actionable, maintenance-friendly formats.
- Facilitate handover meetings, walkthroughs, and digital training to empower FM teams.
Lifecycle-Centric Data Strategy
- Align BIM workflows with long-term asset management goals, not just project closeout.
- Support digital twin readiness through structured, future-proof asset information.
- Enable smarter decision-making around maintenance, renovations, and portfolio-wide planning.